aguilaitconsulting

Network Engineer

Describe the measurable activities and the stages which they are required to be provided              β€’            Leverage LLD, Connectivity Matrix and other project materials to, o            Produce patching schedule for DC sites (we acknowledge that a subset of NW engineers will be familiar with this activity) o            Prepare configuration of network devices as per LLD and […]